Skip Navigation

Hillview Bathroom

Hillview Bathroom

Before
after

The homeowner’s tub/shower area was leaking around the tub and the window. Every aspect of the bathroom was outdated and struggling with performance, and they needed a full solution.

Maeser gutted the bathroom to the studs and installed a steel tub with solid acrylic wall panels to the ceiling. We waterproofed the window, fully tiled the floor, and installed a new vanity area and comfort height commode with a slow-close seat.

Financing Options
Financing available for your new HVAC system or electrical project!
Maintenance Plan
Get peace of mind and extend the life of your equipment.
OUr Reviews

See What Our Clients Say

Schedule Your Service Today!